CNRL Plant Piping Design through Worley
The CNRL plant construction was completed through Worley
As built, upgrading and expansion projects for the Firebag Suncor plant through Worley
As built, upgrading and expansion projects for the O/S Suncor plant through Worley
Pre-project planning (PPP).
Front-end loading (FEL), conceptual planning, programming/schematic design as PFD , and early project planning.
Project Feasibility analysis.
FEE design focuses on the technical requirements, as well as rough investment costs for the project.
Separate the FEE in different packages based on the project phases and budget.
The FEE package is to be used as the basis for bidding the Execution Phase Contracts (EPC, EPCI, etc.) and is used for the design basis.
GEO-PIMEC focuses on technical requirements and identifying main costs, long lead equipment, and instruments for a proposed project.
Project Scope.
Defined (civil).
HAZOP, safety, and ergonomic studies.
2D & 3D preliminary models.
Equipment layout and installation plan.
Engineering design package development.
Major equipment list.
Automation strategy.
PFD’s.
Project timeline.
Fixed-bid quote.